The IC demonstration site is located at US 84 in Wayne county, MS. This project is a 4-mile long new asphalt construction with two lanes in each traffic direction. The top 6 in. of granular (sandy) subbase will be treated with ~5% cement as the MSDOT 9C chemically treated granular material.
Javascript is required to view this map.
|
|
Roller shipping address MDOT Waynesboro Project Office (about 3 miles from the start of the project)6716 Highway 184, Waynesboro, MS 39367 Contact: Mark Smith (601) 735-1122 All IC rollers should be shipped to the above address by Friday, July 10. |
Attention Participating Roller Vendors - the GPS requirements for IC rollers are described here.
|
|
Open House (10:00AM to 3:00PM, Thursday, July 16): Session 1 - 10:00AM to noon - Indoor Presentation (Waynesboro Auditorium, 1008 Benton St., Waynesboro, MS 39367-2461) Session 2 - 1:30PM to 3:00PM - Outdoor Demonstration (the US 84 field site) Contact: Randy Battey, MSDOT, 601-359-7650; Scott White, MSDOT, 601-410-4032 Presentation files
|
Weather condition of the test site. |
A "mini-demo" may be conducted for the Type IV asphalt materials. It is treated as a separated demo from the full blown demo.
NA
Meetings
Documents
![]() |
![]() |
Video Clip No.1
Video Clip No.2
Video Clip No.3
Video Clip No.4