FHWA and TPF IC Projects

These projects existed under the TPF Intelligent Compaction Project, which lasted from 2008 to 2011 as a part of the US FHWA and Transportation Pooled Fund (TPF) project TPF-5(128) “Accelerated Implementation of Intelligent Compaction Technology for Embankment Subgrade Soils, Aggregate Base and Asphalt Pavement Material”. This study was intended to accelerate specification development, develop an IC expertise base, and evaluate current IC equipment. If you would like additional general information about this study, you can learn more here.

View 2010 projects, 2009 projects, or 2008 projects.

final-report-cover

To download the IC Final Report, please click here.