  • This project is a day-time paving job located at I-71, 40 miles north of Columbus.
  • ODOT Project 113011 Morrow I-71 – a widening project for SB/NB with lane closures.
Date:
Monday, June 24, 2013 – Thursday, June 27, 2013

Project Map

Important Notices

  • Roller shipping – Kokosing field office, 6022 SR 95, Mount Gilead, Ohio  43338 (Exit 151 of I-71) (by June 21), Contacts: Bart Moody, 419-295-4591
  • All onsite personnel need to observe the Kokosing Safety and Access Plan.
  • Machine Setup and Trial Runs (2-4PM, Sunday, June 23) at the Kokosing field office, 6022 SR 95, Mount Gilead, Ohio  43338 (Exit 151 of I-71) (for vendors and FHWA IC team only)
  • Training for Roller Operators (7-8AM, Monday, June 24) at the staging area (instructions are provided via emails)
  • Onsite personnel – please bring a copy of the Field Summary Sheets

Open House

Date:

Thursday, June 27. 8AM to noon (EDT)

Location:

Kokosing Training Center: 125 Mount Vernon Ave., Fredericktown, OH 43019

Register online
Details and presentation files

Weather Condition

wuLogoUrl

 

Click the WeatherUnderground icon for near term weather forecast. 

Material Types

Asphalt – 1.75″ 19mm intermediate Course

Roller(s)

  • HAMM HD+120a double drum IC roller
  • Sakai SW880 double drum IC roller
Other Testing Equipment
  • GPS (SiteTech/Trimble OH)
  • GPS (TopCon)
  • LWD-a (Lightweight deflectometer for asphalt) (Kessler)
  • FWD (Falling weight deflectometer) (ODOT)(TBA)

Objectives

  • Train contractors and DOT on intelligent compaction technologies
  • Study the relationship between IC and asphalt in-place densities